Deterministic Null: A Control Experiment for Neural and Agentic Substrates

This study builds and registers an explicit zero-model-call control arm (Shape D: a 64-bit integer loop over a verified append-only case store, implemented across Rust, Go, Python, C++20, and Julia in openIE-dev/deterministic-null) and measures the paired completion increment of multi-vendor frontier cloud and local open-weight language models against it under League of Entropy drand public beacons and OpenTimestamps Bitcoin Calendar receipts.

What the study claims and what it does not

  1. Cross-language determinism (Gate G2): five independent implementations (Rust, Go, Python, C++20, and Julia) agree bit-for-bit on the frozen conformance store digest (0da4df8d9ccbce1e...) and 1,000,000-record DNULLMM1 mmap probe checksum (15027705736) with zero floating-point operations inside the loop and zero model calls at decision time.
  2. Pre-beacon cryptographic registration (Gate G1) & companion closures: Track-A (reg-exp-001, 2,840 instances) and Track-B (reg-exp-002, 1,190 unique instances across Unique 3-SAT, BFCL v3, tau-bench Retail, BigCodeBench v0.1.3, and SWE-bench Verified) lock all store digests, prompts, and sample sizes before target drand rounds exist, while companion suite exp-003 adds non-Anthropic cloud breadth (OpenAI gpt-oss-120b +45.83 pts, xAI Grok 4.20 +44.17 pts over N1), resolves formal.unique_3sat_drat via extended thinking (49/50) and 6-turn O(m) clause feedback (50/50, matching standalone CDCL+DRAT B1 at $0.00), and verifies real upstream SWE-bench Verified multi-turn GitHub patches + pytest execution (5/6 Opus 5.5, 5/6 0-call replay).
  3. Two empirical regimes separated by Good–Turing unseen mass: when structural feature cells saturate, frozen Shape D matches or approaches neural completion at zero decision-time model calls; on open compositional synthesis, neural substrates show large positive increments while online crystallization cuts recurring Zipfian model calls and energy by 3.59×.
  4. Not claimed: wall-plug or named-rail hardware joule meter readings (board_metered = false, measured_j = None; local Apple M5 Max counters are on-chip IOReport and kernel ri_energy_nj reported_j values, and closed-API server energy is recorded strictly as not_available), human third-party sealed Tier-3 task authoring, or that any shortfall of a finite store establishes model necessity.
Four-stage Deterministic Null pre-beacon lock and paired evaluation protocol. Protocol diagram, not a hardware rail reading.
Pre-beacon registration (Gate G1 + OpenTimestamps + drand) and paired evaluation protocol. Protocol diagram, not a rail power reading.